Principles

Working alongside the design team

01

Early engagement

Involvement from early design stages so cost and buildability inform the design, not just the price.

02

Buildability and cost input

Practical input on construction method, sequencing and cost before details are fixed.

03

RIBA stage aware

We work to where the scheme is in the RIBA Plan of Work, from concept through technical design to construction.

04

Drawings and specifications to price

Send drawings and specifications at any stage and receive a structured, itemised price.

05

RFIs and design query log

Queries raised formally as RFIs and tracked in a design query log until closed.

06

Drawing register

A drawing register with revision control, so the site always builds from the current issue.

07

Contractor's design portions

Contractor's design portions agreed and defined in writing at tender.

08

JCT contracts

Experience of JCT Minor Works, Intermediate and Design and Build forms.

09

Traditional or design and build

Traditional procurement with the design team retained, or design and build with Wentways taking design responsibility.

10

CDM

We work from the pre construction information and prepare a construction phase plan for the works.

11

Adapted and accessible homes

Experience of schemes adapted for accessible living.

12

Respect for the design

The architect is kept informed through construction and changes go through the agreed route.

Send drawings to price

Send the details and you will get a written quotation with a clear scope of works.

Start an enquiry