02 Delivery team

Disciplines we cover on every project

Two people in hard hats checking plans on site

01

Quantity surveying and cost control

Pricing, cost plans, budget tracking and cost reporting from tender to final account.

02

Building surveying and measured surveys

Condition and measured surveys that make scope and pricing accurate from the start.

03

Architectural technician and design coordination

Reviewing drawings for buildability, coordinating design information and resolving queries early.

04

Bid and pre construction

Tender analysis, clarifications, programme and method, and compliant priced returns.

05

Contracts and operations

Site management, programme control, subcontract packages and progress reporting.

06

Compliance and procurement

Supply chain selection, procurement of materials and packages, and document control.

07

Health and safety

Risk assessments, method statements, induction and site safety management.

About the delivery team

03 Architects

Working with architects

Pencil and scale rule on technical drawings

01

Early engagement

Involvement from early design stages so cost and buildability inform the design, not just the price.

02

Buildability and cost input

Practical input on construction method, sequencing and cost before details are fixed.

03

RIBA stage aware

We work to where the scheme is in the RIBA Plan of Work, from concept through technical design to construction.

Working alongside the design team

04 Procurement

Procurement and tendering

01

Invitations to tender

Send tender documents to tenders@wentways.co.uk. Every invitation is acknowledged and reviewed.

02

Frameworks

Framework opportunities considered where the scope fits.

03

Subcontract packages

Packages priced for main contractors, with the relationship kept with you.

Procurement routes

05 Controls

Commercial controls

01

Budgets and cost plans

A budget set against the scope and tracked from day one.

02

Cost value reconciliation

Regular CVR so cost and value are always understood.

03

Interim valuations

Valuations submitted against progress on the agreed cycle.

04

Variations

Instructions recorded, priced and agreed before work proceeds wherever possible.

05

Final account

Prompt agreement of the final account with supporting records.

06

Reporting

Lookahead programmes and weekly progress reports.

07

Handover

O&M manuals, health and safety file, as built drawings, certificates, defects period and retention release.

Commercial controls

06 Compliance

Compliance and health and safety

A row of yellow hard hats

01

Risk assessments and method statements

Site specific RAMS prepared before each package starts.

02

Site inductions

Every operative inducted to the site rules and risks.

03

Health and safety management

Site safety managed by the delivery team throughout the works.

Compliance

07 Sectors

Sectors served

01

Developers

New build and conversion schemes.

02

Landlords and managing agents

Planned works, voids and refurbishment.

03

Main contractors

Subcontract and trade kitchen packages.

04

Occupiers

Office, retail and commercial fit out.

05

Property companies

Portfolio refurbishment and improvement.

06

Public sector and frameworks

Tendered and framework opportunities.

08 Contact

One point of contact

Each project has a single point of contact backed by the delivery team, so commercial, technical and site questions reach the right person without being passed around. Tenders and briefs to tenders@wentways.co.uk.